How do a carpenter's invoices become figures in an LCA under BR18, the Danish building regulations? Here is the calculation for one house, line by line. The method is in the guide As-built LCA from purchase invoices, and the requirements are on BR18 and LCA (in Danish). These are the figures.
Example with made-up figures: a 140 m² single-family house
The house is made up. So are the invoice lines, the quantities and the EPD for one of the plasterboard lines. The example covers only the carpentry contract: timber, boards, insulation, a little concrete, roofing felt and fittings. The bricklayer, plumber, electrician and the other trades have their own invoices, and they are not included here.
What is not made up:
- The figures for the materials are the generic data in BR18 Annex 2, Table 7 (2025 edition).
- Density, waste and service life for each material type are the ones DiFacto's climate calculation uses.
- Transport and waste in the construction process are calculated with the rates in Annex 2, Tables 10 and 11.
- The calculation is the climate calculation's own. The figures were not typed in by hand.
The reference area is 140 m², and the reference period is 50 years (section 297(4)).
From invoice line to kg CO2e
Each line goes through the same five steps:
- The invoice line. The item, the quantity and the unit, as they stand on the invoice.
- Quantity and unit to kilos. «45x195» on a line in linear metres is thickness and width in mm. «15 mm» on a line in m² is the thickness. Volume times the material's density gives the kilos. Concrete in m³ is multiplied by the density directly.
- Built in and waste. The purchase is split into what is built in and waste. The share of waste is fixed for each material type and is in the CSV file. Waste counts in the construction process (A5), not in the building's materials.
- The data source. If the item has a valid EPD, it is used. Otherwise the Table 7 row for the material type is used. The data source is shown on the line.
- kg CO2e. The built-in quantity is multiplied by the figures for production (A1–A3), replacement (B4), waste processing (C3) and disposal (C4).
The table: 12 invoice lines, worked through
Example with made-up figures. Kilos are the quantity bought. kg CO2e is A1–A3, B4, C3 and C4 for the built-in part.
| Invoice line | Quantity | Kilos (bought) | Data source | kg CO2e |
|---|---|---|---|---|
| Konstruktionstræ C24 45x195 mm (structural timber) | 420 lin. m | 1,732 | Table 7, row #B1325 | 165.8 |
| Konstruktionstræ C24 45x145 mm (structural timber) | 360 lin. m | 1,104 | Table 7, row #B1325 | 105.7 |
| Konstruktionstræ C24 45x95 mm (structural timber) | 680 lin. m | 1,366 | Table 7, row #B1325 | 130.8 |
| Lægte 38x73 mm (structural timber) | 950 lin. m | 1,239 | Table 7, row #B1325 | 118.5 |
| OSB-plade 15 mm (OSB board) | 60 m² | 540 | Table 7, row #G1292 | 278.6 |
| Gipsplade 13 mm (plasterboard) | 260 m² | 2,434 | Product EPD (made up) | 626.9 |
| Gipsplade 13 mm (plasterboard) | 120 m² | 1,123 | Table 7, row #D1515 | 284.2 |
| Mineraluld 195 mm (mineral wool insulation) | 145 m² | 848 | Table 7, row #D1535 | 445.2 |
| Mineraluld 95 mm (mineral wool insulation) | 160 m² | 456 | Table 7, row #D1535 | 239.4 |
| Fabriksbeton C25/30 (ready-mixed concrete) | 3 m³ | 6,900 | Table 7, row #B1433 | 760.8 |
| Tagpap, underpap (roofing felt) | 160 m² | – | Table 7 (#D1501), but no mass | not counted |
| Skruer og beslag (screws and fittings) | 4 packs | – | Below the de minimis limit (Table 6) | not counted |
| Total, 10 lines | 3,155.8 |
Download the lines as CSV (column names in Danish). The file has one row per invoice line with mass, waste, data source and kg CO2e per module, including A4, A5 and D.
Two lines do not count
- Tagpap, underpap (roofing felt). The material type has no fixed density, and the invoice gives neither weight nor kilos. Without a mass the line cannot be calculated. It stays as missing until the weight per m² is known.
- Skruer og beslag (screws and fittings). Nails, screws and fittings are below the de minimis limit in Annex 2, Table 6. They are not part of the calculation.
Why does the timber add so little?
The Table 7 row for structural timber has a negative A1–A3, because the wood took up CO2 while it grew. The row has a positive C3, because the wood is incinerated when the building is demolished. For the 4 lines of structural timber, A1–A3 is −5,956.8 kg CO2e and C3 is 6,477.5 kg CO2e. BR18 counts both, so the timber ends up close to zero.
EPD or generic data
The two plasterboard lines are the same board from two deliveries. One has an EPD, the other does not. With the made-up EPD the plasterboard gives 2.41 kg CO2e per m² bought. With Table 7 it gives 2.37 kg CO2e per m² bought. The difference comes only from the data source. A real EPD figure can be above or below Table 7.
The construction process and module D
The construction process is calculated separately. Transport of the materials to the site (A4), waste (A5) and the fixed amounts for transport and removal of waste give 1,231.3 kg CO2e. That is 0.176 kg CO2e per m² per year. The site's own energy (diesel, electricity and heating) is not included, because it is not on the carpenter's material invoices.
Module D, the reuse potential, is −4,057.6 kg CO2e for the lines that count. It is shown in the calculation, but it does not count towards any limit value.
What the figure can be used for under BR18 sections 297–298
The result for the materials is 0.451 kg CO2e per m² per year. The figure is a contribution, not a result for the house:
- The limit for the building (section 298) covers materials and operational energy (B6) for the whole building. The example is one contract and has no operation. The figure cannot be held against the limit on its own.
- The limit for the construction process (A4–A5) also covers the whole construction. The construction process figure above is the carpentry contract's share.
- The documentation at completion must show the building as constructed (sections 40 and 297). Invoice lines like these are a basis for the quantities. The consultant or the turnkey contractor combines them with the other trades' figures, the operation and the site's energy.
The example shows the method. It is not an approved calculation for a building.
How DiFacto does it
DiFacto's climate calculation goes through the same steps for each case. The system sets the material type on the item, finds the data source and calculates the kilos, the waste and the modules. The example's figures were calculated with the same functions and the same reference data. What the system does, and what you supply yourself, is in the guide.