Example
Example: an EPD for a concrete product states 250 kg CO2e per m³ for modules A1–A3. The invoice shows 30 m³. The production's climate impact is 30 × 250 = 7,500 kg CO2e. The figures are made up.
Confused with: Generic data
Generic data are the state's table values for types of material in BR18's annex 2, table 7. An EPD applies to a given product or product type and can replace the table value.
More about the word
An EPD is not valid until it is verified under ISO 14025, and it is published by a programme operator; the Danish one is EPD Danmark. Check the validity in the EPD or with the programme operator. Many EPDs use another unit than the invoice, such as m³ or tonnes, so the quantity must be converted first.